Click to open the HelpDesk interface
AECE - Front page banner

Menu:


FACTS & FIGURES

JCR Impact Factor: 0.800
JCR 5-Year IF: 1.000
SCOPUS CiteScore: 2.0
Issues per year: 4
Current issue: Feb 2024
Next issue: May 2024
Avg review time: 77 days
Avg accept to publ: 48 days
APC: 300 EUR


PUBLISHER

Stefan cel Mare
University of Suceava
Faculty of Electrical Engineering and
Computer Science
13, Universitatii Street
Suceava - 720229
ROMANIA

Print ISSN: 1582-7445
Online ISSN: 1844-7600
WorldCat: 643243560
doi: 10.4316/AECE


TRAFFIC STATS

2,548,886 unique visits
1,012,892 downloads
Since November 1, 2009



Robots online now
PetalBot
bingbot


SCOPUS CiteScore

SCOPUS CiteScore


SJR SCImago RANK

SCImago Journal & Country Rank




TEXT LINKS

Anycast DNS Hosting
FEATURED ARTICLES

Application of the Voltage Control Technique and MPPT of Stand-alone PV System with Storage, HIVZIEFENDIC, J., VUIC, L., LALE, S., SARIC, M.
Issue 1/2022

AbstractPlus






LATEST NEWS

2023-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2022. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.800 (0.700 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 1.000.

2023-Jun-05
SCOPUS published the CiteScore for 2022, computed by using an improved methodology, counting the citations received in 2019-2022 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2022 is 2.0. For "General Computer Science" we rank #134/233 and for "Electrical and Electronic Engineering" we rank #478/738.

2022-Jun-28
Clarivate Analytics published the InCites Journal Citations Report for 2021. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 0.825 (0.722 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.752.

2022-Jun-16
SCOPUS published the CiteScore for 2021, computed by using an improved methodology, counting the citations received in 2018-2021 and dividing the sum by the number of papers published in the same time frame. The CiteScore of Advances in Electrical and Computer Engineering for 2021 is 2.5, the same as for 2020 but better than all our previous results.

2021-Jun-30
Clarivate Analytics published the InCites Journal Citations Report for 2020. The InCites JCR Impact Factor of Advances in Electrical and Computer Engineering is 1.221 (1.053 without Journal self-cites), and the InCites JCR 5-Year Impact Factor is 0.961.

Read More »


SEARCH THE JOURNAL CONTENT


Enter one or more keywords to search for.
For exact phrase matching use quotation marks (e.g. "speed controller").
Note that '*' and '?' wildcards are supported.

Search for:

Results per page:

Match: any search words all search words

Search results for: simulation

638 results found.

64 pages of results.
Sorted by relevance / Sort by date
Year: 2023, Volume: 23, Number: 2
... the (DAM) and Real Time Market (RTM) to maximize profit. uncertainty arising from RES. In addition, CVaR (Conditional They have performed the simulation on a 33-bus distribution Value at Risk) as a risk measurement technique is applied network and modeled the problem using GAMS/CPLEX against the risk arising from ...
Terms matched: 1  -  Score: 11  -  1,594k
Year: 2018, Volume: 18, Number: 3
... b) Figure 10. (a) Power efficiency and operating frequency with change of the load current IL, (b) Comparison of efficiency between experiment and simulation The proposed triggering operation is similar to the digital sampling process of an analog signal, which allows only a certain value during a limited time period. The ...
Terms matched: 1  -  Score: 11  -  1,407k
Year: 2023, Volume: 23, Number: 1
... with the analog and pulse stream transmission and reconstruction. digital signals. However, the complete performance evaluation will be explained in more details in the next III. SIMULATION AND RESULTS IN A BAND LIMITED section. CHANNEL B. Performance Analysis The simulation time and results of the proposed scheme is In this section, we will ...
Terms matched: 1  -  Score: 11  -  3,221k
Year: 2007, Volume: 7, Issue: 2
... the controller design: "digital redesign" and one feedback loop. The output voltage (Vout) is brought to a "direct digital design". The simulation resulted from the design low voltage level at the analogic input (A /D) of the digital are also described. controller. The A/D ...
Terms matched: 1  -  Score: 11  -  565k
Year: 2022, Volume: 22, Number: 1
... ,h € ƒ r S KA (5) ƒ1, ApplianceON 98 Advances in Electrical and Computer Engineering Volume 22, Number 1, 2022 Discomfort cost model Simulation results show the impact of the parameters, The discomfort cost model for each consumer is cost, and comfort on the performance of the proposed expressed as below ...
Terms matched: 1  -  Score: 11  -  3,544k
Year: 2015, Volume: 15, Number: 1
... calculation of the RMS active, reactive, apparent capacities with the consideration of the impact of harmonic components of the current and voltage in EPG elements. III. SIMULATION RESULTS In order to assess the GIC impact on an electric power grid a model of electric power grid of Samara region was developed. Characteristic features of Samara ...
Terms matched: 1  -  Score: 11  -  785k
Year: 2010, Volume: 10, Issue: 3
... single-phase to ground u21, u22 ,L, u2 p U( p p)= (u1 ,L, u p)=. fault. Through simulation experiments, using these actual M M M M measurement data of corresponding variables, we can carry u, u ,L, u through feature extraction of ...
Terms matched: 1  -  Score: 11  -  562k
Year: 2015, Volume: 15, Number: 2
... III. Section IV presents the optimization techniques used for tuning the gain parameters of the where, constant gain, frequency of zeros and poles are controllers. The simulation results of considered power determined by: system with PID and FOPID controllers optimized by GSA (  € 2i) ƒ p ƒ i ƒ p ƒ ...
Terms matched: 1  -  Score: 10  -  1,058k
Year: 2019, Volume: 19, Number: 2
... margins of circuits [2]. oscilloscope to verify its operation. However, there was a Therefore, the EMI problem becomes more critical. mismatch between the simulation and experimental results. Nowadays, electrical and electronic systems are very It is difficult to model commercial ICs accurately since their popular and present anywhere in our life-environment ...
Terms matched: 1  -  Score: 10  -  1,450k
Year: 2015, Volume: 15, Number: 3
... capability. Parallel fairly "big" in terms of volume, increasing velocity and framework for processing massive spatial data is an active variety. Therefore, analyses, simulation, mining tasks on research topic recently. Researchers have proposed some geospatial data sets captured with ubiquitous location-aware parallel frameworks for point cloud algorithms [6] and ...
Terms matched: 1  -  Score: 10  -  1,662k
Result Pages: << Previous 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 Next >>


Search took 0.315 seconds


The search engine database includes all papers published after 2007, including titles, author names, abstracts, keywords, full papers text, references and citations. For papers published between 2001 and 2006, please visit the Archive section.


We invite you to try the most frequently used search terms:

system - power - control - fault - network - load - model - frequency - converter - transformer - harmonic - computer - algorithm - cancer - simulation - computer - estimate - optimal control - expert system - electromagnetic - interference - data transmission - neural network - electrocardiogram signal - model - cluster - design - wavelet - antenna - wireless sensor - coupling - robust - noise - signal processing - system identification - translation - nonlinear systems - induction motor - speed controller - shape optimization - fuzzy network - wireless sensor network


Website loading speed and performance optimization powered by: 


DNS Made Easy